Categories

Knowledge

Preparation of the automatic winding machine before use
Jul 27, 2018

Four inspections before the automatic winding machine is used normally:

1) Check for debris or flammable items around the unit that interfere with movement.

2) Check if the connection of the coupling is firm, whether the conveyor belt is connected well, whether the conveyor belt is tight, whether the unit transmission is flexible, and whether there is abnormal phenomenon such as friction, jamming and swaying.

3) Check if the wiring of the line is reliable and the melt is damaged.

4) Check if the power supply voltage is normal, whether the three-phase voltage is balanced, and whether the voltage is too high or too low.


  • QR CODE
  • facebook